Construction Project Construction Project of Highway No. 7 Intersection Road (Km. 107+200) – Laem Chabang Port (Section 1-4), Sri Racha District, Chonburi Province

Supervise the construction of a 0.28 m. thick reinforced concrete road with 6-8 traffic lanes and the construction of a large bridge across 3 intersections and 1 railway crossing, along with the construction of a drainage system, the installation of lighting systems, signs and traffic markings, along with safety equipment, for a total distance of 10.570 kilometers.
Contract for construction supervision of a groundwater management and learning center

Controlling the construction of a 9-storey building with a usable area of approximately 7,400 square meters, including demolition work and procurement of field offices, architectural work, structural engineering work, building systems engineering work, procurement of educational equipment and facilities within the building.
Construction project for warehouse buildings, drainage systems around the building, roads and parking lots

Supervise construction work, including a warehouse building, 1 shared bathroom, 1 electrical room, drainage system around the building, roads and parking lot floors, and supervise interior decoration work of the office building.
Construction supervision work for the construction project of a 3-storey reinforced concrete office building with a car park in Sam Khok District, Pathum Thani Province

Supervise the construction work of a 3-storey reinforced concrete office building, which includes architectural, civil and structural engineering, electrical, lighting, communication, air conditioning, sanitation, fire protection, and lightning protection systems, as well as providing various advice.
Construction supervision work for the construction project of Road No. 1, Samut Prakan City Planning Plan, Samut Prakan Province

Controlling the construction of asphalt roads, 0.10 meters thick, 4 traffic lanes, traffic surface width 3.25 meters per lane, with a footpath width of 3.00 meters on each side.
Construction supervision work for the construction project of the road intersection, Highway 3452 – Ban Sang Intersection (Section 1), Ban Sang District, Prachin Buri Province

Controlling the construction of asphalt roads with a thickness of 0.10 meters, 2 traffic lanes, traffic surface width of 3.50 meters per lane, shoulder width of 2.50 meters on each side.
Road construction project No. Chor Chor. 2004, intersection of Highway 34 – Highway 314 (Section 1), Bang Pakong District, Mueang District, Chachoengsao Province

Construction of a 0.10 meter thick asphalt concrete road, a 4-lane road, each lane 3.50 meters wide, dividing traffic directions with a concrete wall-type island 3.20 meters wide, with shoulders 3.00 meters wide. In the community area there is a sidewalk 3.40 meters wide
Construction supervision work for the construction project of the Kamphaeng Phet City Planning Road, Kamphaeng Phet Province

Controlling the construction work of the road construction project, Kamphaeng Phet City Planning, Kamphaeng Phet Province, starting at the intersection of Highway No. 1
Sukhumvit 6 Project, Khwaeng Khlong Toey, KhetKhlong Toey, Bangkok

Soil Investigation and testing of soil and material engineering properties in the laboratory (Laboratory Tests)
Highway No. 4027, Tha Ruea – Mueang Mai section, Thalang District, Phuket Province

Soil Investigation and testing of soil and material engineering properties in the laboratory (Laboratory Tests)