
 
															Construction supervision work for the construction project of Road No. 1, Samut Prakan City Planning Plan, Samut Prakan Province
Department of Rural Roads
Samut Prakan Province
year 2024
400 million baht
- Controlling the construction of asphalt roads, 0.10 meters thick, 4 traffic lanes, traffic surface width 3.25 meters per lane, with a footpath width of 3.00 meters on each side. - Construction of 2 bridges on the route, with PLANK GIRDER structure, each bridge length 30 m. - Drainage system, lighting along the route, traffic signs and safety facilities - Distance 1.925 kilometers






Controlling the construction of a 6-lane asphalt concrete road, a parallel reinforced concrete bridge over an intersection, totaling 4 lanes, 10.50 meters wide on each side, 382.00 meters long.

Construction control work on the runway to support commercial aircraft, size A300-600, for take-off and landing. Expand and improve the apron and the original aircraft parking area to be able...

Controlling the construction of the road from Highway 33 - Ban Khlong Luek border checkpoint, Aranyaprathet District, Sa Kaeo Province, starting the project at km. 0+000 to km. 15+425

Controlling the construction of roads No. Chor and Kor, Chai Nat City Planning, asphalt concrete road surface, thickness 0.10 meters, size 4 traffic lanes,

Supervise the construction of a 4-lane asphalt concrete road, construct a 4-lane reinforced concrete bridge across Lam Buribun Canal, Old Lam Takong Canal and New Lam Takong Canal, construct 2...

Controlling the construction of the elevated bridge heading in and out to the project of the road separating Highway 33 - Ban Khlong Luek border checkpoint, with a size of...