
Construction supervision work for the construction project of the Kamphaeng Phet City Planning Road, Kamphaeng Phet Province
Department of Rural Roads
Kamphaeng Phet City, Kamphaeng Phet Province
year 2027
849 million baht
Controlling the construction work of the road construction project, Kamphaeng Phet City Planning, Kamphaeng Phet Province, starting at the intersection of Highway No. 1 (Phahon Yothin Road), km. 461 + 800, meeting with Highway No. 101, km. 361 + 948 and Highway No. 112 (Kamphaeng Phet Bypass Road), km. 13 + 064, is the end point of the project, with a total distance of 3.510 kilometers.





Controlling the construction of a 6-lane asphalt concrete road, a parallel reinforced concrete bridge over an intersection, totaling 4 lanes, 10.50 meters wide on each side, 382.00 meters long.

Construction control work on the runway to support commercial aircraft, size A300-600, for take-off and landing. Expand and improve the apron and the original aircraft parking area to be able...

Controlling the construction of the road from Highway 33 - Ban Khlong Luek border checkpoint, Aranyaprathet District, Sa Kaeo Province, starting the project at km. 0+000 to km. 15+425

Controlling the construction of roads No. Chor and Kor, Chai Nat City Planning, asphalt concrete road surface, thickness 0.10 meters, size 4 traffic lanes,

Supervise the construction of a 4-lane asphalt concrete road, construct a 4-lane reinforced concrete bridge across Lam Buribun Canal, Old Lam Takong Canal and New Lam Takong Canal, construct 2...

Controlling the construction of the elevated bridge heading in and out to the project of the road separating Highway 33 - Ban Khlong Luek border checkpoint, with a size of...