- Controlling the construction of asphalt roads with a thickness of 0.10 meters, 2 traffic lanes, traffic surface width of 3.50 meters per lane, shoulder width of 2.50 meters on each side. - At the intersection, there is a 4-lane road construction with a 4.20-meter wide median, 3.50-meter wide traffic surface per lane, and 2.50-meter wide shoulders on each side. - Construction of a total of 7 bridges along the route - Drainage system, traffic signs, lighting and safety facilities - Distance 7.200 kilometers





Controlling the construction of a 6-lane asphalt concrete road, a parallel reinforced concrete bridge over an intersection, totaling 4 lanes, 10.50 meters wide on each side, 382.00 meters long.

Construction control work on the runway to support commercial aircraft, size A300-600, for take-off and landing. Expand and improve the apron and the original aircraft parking area to be able...

Controlling the construction of the road from Highway 33 - Ban Khlong Luek border checkpoint, Aranyaprathet District, Sa Kaeo Province, starting the project at km. 0+000 to km. 15+425

Controlling the construction of roads No. Chor and Kor, Chai Nat City Planning, asphalt concrete road surface, thickness 0.10 meters, size 4 traffic lanes,

Supervise the construction of a 4-lane asphalt concrete road, construct a 4-lane reinforced concrete bridge across Lam Buribun Canal, Old Lam Takong Canal and New Lam Takong Canal, construct 2...

Controlling the construction of the elevated bridge heading in and out to the project of the road separating Highway 33 - Ban Khlong Luek border checkpoint, with a size of...