															Project to extend the runway length, turnaround area, aircraft parking area and airport electrical system, Narathiwat Airport, Mueang District, Narathiwat Province
Department of Civil Aviation
Mueang District, Narathiwat Province
year 2016
474 million baht
Construction control work on the runway to be able to support commercial aircraft size A300 - 600 for take-off and landing, expanding and improving the apron and the original aircraft parking area to be able to park 1 A300 - 600 aircraft and 2 B737 - 400 aircraft parked simultaneously, along with the airport's electrical systems, internal roads, drainage system, painting signs, making a new water supply system, building a bridge over the irrigation canal, making a new entrance gate fence, in accordance with the standards of the International Civil Aviation Organization.





Controlling the construction of a 6-lane asphalt concrete road, a parallel reinforced concrete bridge over an intersection, totaling 4 lanes, 10.50 meters wide on each side, 382.00 meters long.

Construction control work on the runway to support commercial aircraft, size A300-600, for take-off and landing. Expand and improve the apron and the original aircraft parking area to be able...

Controlling the construction of the road from Highway 33 - Ban Khlong Luek border checkpoint, Aranyaprathet District, Sa Kaeo Province, starting the project at km. 0+000 to km. 15+425

Controlling the construction of roads No. Chor and Kor, Chai Nat City Planning, asphalt concrete road surface, thickness 0.10 meters, size 4 traffic lanes,

Supervise the construction of a 4-lane asphalt concrete road, construct a 4-lane reinforced concrete bridge across Lam Buribun Canal, Old Lam Takong Canal and New Lam Takong Canal, construct 2...

Controlling the construction of the elevated bridge heading in and out to the project of the road separating Highway 33 - Ban Khlong Luek border checkpoint, with a size of...