Road construction project for Highway 33 - Ban Khlong Luek border checkpoint, Aranyaprathet District, Sa Kaeo Province
Department of Rural Roads
Aranyaprathet District, Sa Kaeo Province
year 2017
947 million baht
Supervise the construction of the road from Highway 33 - Ban Khlong Luek Border Checkpoint, Aranyaprathet District, Sa Kaeo Province, starting the project at km. 0+000 to km. 15+425, total distance 15.425 kilometers, construction of a bridge over the railway at km. 2+049, 2 directions, 2 traffic lanes in each direction, 3.50 meters per traffic lane, 2.50 meters wide shoulder, 700 meters long.





Controlling the construction of a 6-lane asphalt concrete road, a parallel reinforced concrete bridge over an intersection, totaling 4 lanes, 10.50 meters wide on each side, 382.00 meters long.

Construction control work on the runway to support commercial aircraft, size A300-600, for take-off and landing. Expand and improve the apron and the original aircraft parking area to be able...

Controlling the construction of the road from Highway 33 - Ban Khlong Luek border checkpoint, Aranyaprathet District, Sa Kaeo Province, starting the project at km. 0+000 to km. 15+425

Controlling the construction of roads No. Chor and Kor, Chai Nat City Planning, asphalt concrete road surface, thickness 0.10 meters, size 4 traffic lanes,

Supervise the construction of a 4-lane asphalt concrete road, construct a 4-lane reinforced concrete bridge across Lam Buribun Canal, Old Lam Takong Canal and New Lam Takong Canal, construct 2...

Controlling the construction of the elevated bridge heading in and out to the project of the road separating Highway 33 - Ban Khlong Luek border checkpoint, with a size of...