Road construction project No. Chor Chor. 2004, intersection of Highway 34 - Highway 314 (Section 1), Bang Pakong District, Mueang District, Chachoengsao Province
Department of Rural Roads
Bangpakong District, Mueang District, Chachoengsao Province
year 2025
549 million baht
Construction of a 0.10 meter thick asphalt concrete road, a 4-lane road, each lane 3.50 meters wide, dividing traffic directions with a concrete wall-type island 3.20 meters wide, with shoulders 3.00 meters wide. In the community area there is a sidewalk 3.40 meters wide, a total distance of 4.425 kilometers, along with construction of 2 bridges, the structural form being a BOX GIRDER type, 15 meters long, and the structure being a PLANK GIRDER and BOX GIRDER, 35 meters long (10+15+10).





Controlling the construction of a 6-lane asphalt concrete road, a parallel reinforced concrete bridge over an intersection, totaling 4 lanes, 10.50 meters wide on each side, 382.00 meters long.

Construction control work on the runway to support commercial aircraft, size A300-600, for take-off and landing. Expand and improve the apron and the original aircraft parking area to be able...

Controlling the construction of the road from Highway 33 - Ban Khlong Luek border checkpoint, Aranyaprathet District, Sa Kaeo Province, starting the project at km. 0+000 to km. 15+425

Controlling the construction of roads No. Chor and Kor, Chai Nat City Planning, asphalt concrete road surface, thickness 0.10 meters, size 4 traffic lanes,

Supervise the construction of a 4-lane asphalt concrete road, construct a 4-lane reinforced concrete bridge across Lam Buribun Canal, Old Lam Takong Canal and New Lam Takong Canal, construct 2...

Controlling the construction of the elevated bridge heading in and out to the project of the road separating Highway 33 - Ban Khlong Luek border checkpoint, with a size of...