Road construction project, route No. Chor, Nakhon Ratchasima City Planning, Nakhon Ratchasima Province
Department of Rural Roads
Nakhon Ratchasima City, Nakhon Ratchasima Province
year 2018
1,500 million baht
Supervise the construction of a 4-lane asphalt concrete road, construct a 4-lane reinforced concrete bridge across Lam Buribun Canal, Old Lam Takong Canal and New Lam Takong Canal, construct 2 U-turn points and improve 2 intersections, and other works such as sidewalks, traffic signs, safety facilities, and tree planting.





Controlling the construction of a 6-lane asphalt concrete road, a parallel reinforced concrete bridge over an intersection, totaling 4 lanes, 10.50 meters wide on each side, 382.00 meters long.

Construction control work on the runway to support commercial aircraft, size A300-600, for take-off and landing. Expand and improve the apron and the original aircraft parking area to be able...

Controlling the construction of the road from Highway 33 - Ban Khlong Luek border checkpoint, Aranyaprathet District, Sa Kaeo Province, starting the project at km. 0+000 to km. 15+425

Controlling the construction of roads No. Chor and Kor, Chai Nat City Planning, asphalt concrete road surface, thickness 0.10 meters, size 4 traffic lanes,

Supervise the construction of a 4-lane asphalt concrete road, construct a 4-lane reinforced concrete bridge across Lam Buribun Canal, Old Lam Takong Canal and New Lam Takong Canal, construct 2...

Controlling the construction of the elevated bridge heading in and out to the project of the road separating Highway 33 - Ban Khlong Luek border checkpoint, with a size of...