Project name
Feasibility study project and preparation of environmental impact assessment report, including survey and design of a bridge over Buboy Canal and connecting road, Tung Wa District, Langu District, Satun Province
Project Owner
Department of Rural Roads
Place of operation
Thung Wa District, Langu District, Satun Province
Completed last year
year 2023
Project value
780 million baht
Project details
Survey and design of a reinforced concrete bridge, length 2,340 meters, right of way 12.00 meters, 2 traffic lanes, width of each lane 3.50 meters, no sidewalks, with lighting poles, including design of a connecting road to the project, length 310 meters, reinforced concrete surface, general right of way 13.00 meters, number of traffic lanes per direction 2 lanes, width of each lane 3.50 meters, shoulder 1.00 meters, with lighting poles.




Additional
- ผลงานฝ่ายออกแบบ

Survey and detailed design work on Road No. 15, an existing road designated for expansion, and public hearings, project feasibility studies, initial environmental impact studies (IEEs), and other works.

Survey and detailed design work including design of different levels of Road No. 3, the starting point of the project starts from Highway No. 233 (Nong Khai - Udon) at...

Survey and design of road works, design of intersections connecting to main roads of the Department of Highways, study of impacts on communities, to comply with international standards and safety...

It is an expansion of the original road width along with improvements to the road surface and road components such as the median strip and sidewalks, etc.

Study and select appropriate models and/or routes, study the economic value of the project area, survey, design, estimate costs, study the initial suitability of future road network connections of the...

Survey, design, study and prepare an environmental impact assessment report, as well as improve the landscape of the project, design a connection point to the intersection with the main road...
