Environmental Impact Assessment Report Project for the Road Intersection of Highway 44 – Highway 420, Kanchanadit District, Mueang District, Surat Thani Province
Department of Rural Roads
Kanchanadit District, Mueang District, Surat Thani Province
year 2022
500 million baht
Studying the feasibility and studying the economic value, surveying/initial design (Conceptual Design), publicizing the project, listening to opinions and public participation, estimating the initial cost, and assessing the environmental impact of the project.





Survey and detailed design work on Road No. 15, an existing road designated for expansion, and public hearings, project feasibility studies, initial environmental impact studies (IEEs), and other works.

Survey and detailed design work including design of different levels of Road No. 3, the starting point of the project starts from Highway No. 233 (Nong Khai - Udon) at...

Survey and design of road works, design of intersections connecting to main roads of the Department of Highways, study of impacts on communities, to comply with international standards and safety...

It is an expansion of the original road width along with improvements to the road surface and road components such as the median strip and sidewalks, etc.

Study and select appropriate models and/or routes, study the economic value of the project area, survey, design, estimate costs, study the initial suitability of future road network connections of the...

Survey, design, study and prepare an environmental impact assessment report, as well as improve the landscape of the project, design a connection point to the intersection with the main road...