
Landscape design and improvement survey project, along with preparation of an environmental impact assessment report for Road No. 4011, intersection with Highway No. 2026
Department of Rural Roads
Bueng Khlong Long District, Seka, Bueng Kan Province
year 2021
500 million baht
Survey, design, study and prepare an environmental impact assessment report, as well as improve the landscape of the project, design a connection point to the intersection with the main road of the Department of Highways, study the impact on the community to be in accordance with international standards and the safety of road users, survey, analyze and assess risk points along the route, including designing improvements to the landscape, landscape architecture along the route, or designing various structures, a distance of approximately 18 km.





Survey and detailed design work on Road No. 15, an existing road designated for expansion, and public hearings, project feasibility studies, initial environmental impact studies (IEEs), and other works.

Survey and detailed design work including design of different levels of Road No. 3, the starting point of the project starts from Highway No. 233 (Nong Khai - Udon) at...

Survey and design of road works, design of intersections connecting to main roads of the Department of Highways, study of impacts on communities, to comply with international standards and safety...

It is an expansion of the original road width along with improvements to the road surface and road components such as the median strip and sidewalks, etc.

Study and select appropriate models and/or routes, study the economic value of the project area, survey, design, estimate costs, study the initial suitability of future road network connections of the...

Survey, design, study and prepare an environmental impact assessment report, as well as improve the landscape of the project, design a connection point to the intersection with the main road...