Construction project of runway, taxiway, apron and others at Betong Airport
Department of Airports
Betong District, Yala Province
year 2019
1,317 million baht
Detailed design and supervision of construction work of runways, taxiways, aircraft parking aprons, airport electrical systems, internal roads and other components to comply with professional engineering standards, International Civil Aviation Organization (ICAO) standards and other relevant standards, with a runway size of 30 meters wide and 1,800 meters long, and an aircraft parking apron size of 94 x 180 meters, able to accommodate three ATR72 aircraft at the same time.




Controlling the construction of a 6-lane asphalt concrete road, a parallel reinforced concrete bridge over an intersection, totaling 4 lanes, 10.50 meters wide on each side, 382.00 meters long.

Construction control work on the runway to support commercial aircraft, size A300-600, for take-off and landing. Expand and improve the apron and the original aircraft parking area to be able...

Controlling the construction of the road from Highway 33 - Ban Khlong Luek border checkpoint, Aranyaprathet District, Sa Kaeo Province, starting the project at km. 0+000 to km. 15+425

Controlling the construction of roads No. Chor and Kor, Chai Nat City Planning, asphalt concrete road surface, thickness 0.10 meters, size 4 traffic lanes,

Supervise the construction of a 4-lane asphalt concrete road, construct a 4-lane reinforced concrete bridge across Lam Buribun Canal, Old Lam Takong Canal and New Lam Takong Canal, construct 2...

Controlling the construction of the elevated bridge heading in and out to the project of the road separating Highway 33 - Ban Khlong Luek border checkpoint, with a size of...