
Construction project of the elevated road over Highway 37 connecting T.C.P.K.2052 and T.C.P.K.2057, Hua Hin District, Prachuap Khiri Khan Province
Department of Rural Roads
Hua Hin District, Prachuap Khiri Khan Province
year 2021
1,500 million baht
Supervise the construction of a different level road across Highway 37, connecting T.C.P.K.2052 with T.C.P.K.2057, Hua Hin District, Prachuap Khiri Khan Province. This is road construction. The bridge has 4 traffic lanes. There are 2 bridges placed parallel to each other, 2 traffic lanes each, going and returning. The structure is Precast Segmental Box Girder. Under the bridge before reaching the intersection, there will be a U-turn point on both sides. The road connecting the bridge is designed as a 4-lane road with a grass median and U-turn points on both sides.





Controlling the construction of a 6-lane asphalt concrete road, a parallel reinforced concrete bridge over an intersection, totaling 4 lanes, 10.50 meters wide on each side, 382.00 meters long.

Construction control work on the runway to support commercial aircraft, size A300-600, for take-off and landing. Expand and improve the apron and the original aircraft parking area to be able...

Controlling the construction of the road from Highway 33 - Ban Khlong Luek border checkpoint, Aranyaprathet District, Sa Kaeo Province, starting the project at km. 0+000 to km. 15+425

Controlling the construction of roads No. Chor and Kor, Chai Nat City Planning, asphalt concrete road surface, thickness 0.10 meters, size 4 traffic lanes,

Supervise the construction of a 4-lane asphalt concrete road, construct a 4-lane reinforced concrete bridge across Lam Buribun Canal, Old Lam Takong Canal and New Lam Takong Canal, construct 2...

Controlling the construction of the elevated bridge heading in and out to the project of the road separating Highway 33 - Ban Khlong Luek border checkpoint, with a size of...