Project name
Construction supervision work for the underpass construction and road improvement project at the Government Center Intersection on Road No. Chor.1023, Mueang District, Chiang Rai Province
Project Owner
Department of Rural Roads
Place of operation
Mueang District, Chiang Rai Province
Completed last year
year 2027
Project value
849 million baht
Project details
Supervising the construction of a tunnel under an intersection on Road No. Chor.1023, with a tunnel under an intersection approximately 425.00 meters long, with 4 traffic lanes going and returning, each traffic lane 3.50 meters wide, a sidewalk for maintenance 1.20 meters wide on each side, and a ground-level road on the side, 2 traffic lanes on each side, 3.00 meters wide on each lane, 1.50 meters wide shoulders, complete with lighting, drainage, maintenance, and various tunnel equipment.




Additional
- Construction

Controlling the construction of a 6-lane asphalt concrete road, a parallel reinforced concrete bridge over an intersection, totaling 4 lanes, 10.50 meters wide on each side, 382.00 meters long.

Construction control work on the runway to support commercial aircraft, size A300-600, for take-off and landing. Expand and improve the apron and the original aircraft parking area to be able...

Controlling the construction of the road from Highway 33 - Ban Khlong Luek border checkpoint, Aranyaprathet District, Sa Kaeo Province, starting the project at km. 0+000 to km. 15+425

Controlling the construction of roads No. Chor and Kor, Chai Nat City Planning, asphalt concrete road surface, thickness 0.10 meters, size 4 traffic lanes,

Supervise the construction of a 4-lane asphalt concrete road, construct a 4-lane reinforced concrete bridge across Lam Buribun Canal, Old Lam Takong Canal and New Lam Takong Canal, construct 2...

Controlling the construction of the elevated bridge heading in and out to the project of the road separating Highway 33 - Ban Khlong Luek border checkpoint, with a size of...