
Road survey and design project No. 3009
Department of Rural Roads
Starting at the intersection of Highway No. 212, km. 161+400, Tambon Chaiporn, Mueang District, Bueng Kan Province, ending at the intersection of Highway No. 2026, km. 28+675, Ban Non Champa Thong, Bueng Khlong Long District, Bueng Kan Province, a distance of approximately 46 kilometers.
Year 2018
GPS control evidence pins were created along the route in pairs, approximately 5 km apart per pair, for a total of 10 pairs.
Surveying and collecting details of land boundary conditions as specified by the employer, including various buildings and public utilities. Surveying the level values within the project area and around the land boundary to cover and be sufficient for detailed design. Creating maps showing various details within the area, showing level values, showing contour lines, with appropriate scales.
Prepare a map of the land area that the Department of Airports will have to purchase additionally as necessary for the construction of aircraft parking lots. The consultant will use the land map as the main guideline and will survey and make a list of land owners, both with and without title deeds, showing the area, crops and buildings of every plot of land. Then prepare a map of every plot of land in an appropriate scale, showing the appraised price and current purchase and sale price.






Establish horizontal and vertical evidence markers with GPS and survey the control network covering the project area to be used for surveying and collecting details of the topography in the...

GPS control evidence pins were created along the route in pairs, approximately 5 km apart per pair, for a total of 10 pairs.

Surveying and collecting details of land boundary conditions as specified by the employer, including various buildings and public utilities. Surveying the level values within the project area and around the...