- Project name- Survey, design and construction project for aircraft parking extension at Surat Thani Airport 
- Project Owner- Department of Airports 
- Place of operation- Hua Toei Subdistrict, Phunphin District, Surat Thani Province 
- Completed last year- Year 2018 
- Project value- 2 billion baht 
Create a proof pin
Establish horizontal and vertical evidence markers with GPS and survey the control network covering the project area to be used for surveying and collecting details of the topography in the project, 2 pairs.
Details
Surveying and collecting details of land boundary conditions as specified by the employer, including various buildings and public utilities. Surveying the level values within the project area and around the land boundary to cover and be sufficient for detailed design. Creating maps showing various details within the area, showing level values, showing contour lines, with appropriate scales.
Make a map
Prepare a map of the land area that the Department of Airports will have to purchase additionally as necessary for the construction of aircraft parking lots. The consultant will use the land map as the main guideline and will survey and make a list of land owners, both with and without title deeds, showing the area, crops and buildings of every plot of land. Then prepare a map of every plot of land in an appropriate scale, showing the appraised price and current purchase and sale price.




Additional
- Survey Engineering

Establish horizontal and vertical evidence markers with GPS and survey the control network covering the project area to be used for surveying and collecting details of the topography in the...

GPS control evidence pins were created along the route in pairs, approximately 5 km apart per pair, for a total of 10 pairs.

Surveying and collecting details of land boundary conditions as specified by the employer, including various buildings and public utilities. Surveying the level values within the project area and around the...