Controlling the construction of a 6-lane asphalt concrete road, a parallel reinforced concrete bridge over an intersection, totaling 4 lanes, 10.50 meters wide on each side, 382.00 meters long.

Controlling the construction of a 6-lane asphalt concrete road, a parallel reinforced concrete bridge over an intersection, totaling 4 lanes, 10.50 meters wide on each side, 382.00 meters long.

Construction control work on the runway to support commercial aircraft, size A300-600, for take-off and landing. Expand and improve the apron and the original aircraft parking area to be able to park 1 A300-600 aircraft.

Controlling the construction of the road from Highway 33 - Ban Khlong Luek border checkpoint, Aranyaprathet District, Sa Kaeo Province, starting the project at km. 0+000 to km. 15+425

Controlling the construction of roads No. Chor and Kor, Chai Nat City Planning, asphalt concrete road surface, thickness 0.10 meters, size 4 traffic lanes,

Supervise the construction of a 4-lane asphalt concrete road, construct a 4-lane reinforced concrete bridge across Lam Buribun Canal, Old Lam Takong Canal and New Lam Takong Canal, construct 2 U-turn points and improve 2 intersections, and other works such as sidewalks, traffic signs, safety facilities, and tree planting.

Controlling the construction of the elevated bridge heading in and out to the project of the road separating Highway 33 - Ban Khlong Luek border checkpoint, with a size of 2 traffic lanes, along with a drainage system, lighting, and safety equipment.

Detailed design and supervision of construction work of runways, taxiways, aircraft parking aprons, airport electrical systems, internal roads and other components to comply with engineering professional standards.

Supervise the construction of a passenger terminal building with a total usable area of approximately 7,000 square meters, capable of supporting 300 passengers per hour or 0.864 million passengers per year.

Controlling the construction of aircraft parking lots, car parking lots, airport inspection roads, airport electrical systems, including providing advice and suggestions, approval, negotiation, work acceptance, approval of wage disbursement,

Supervise the construction of a different level road across Highway 37, connecting T.C.P.K.2052 with T.C.P.K.2057, Hua Hin District, Prachuap Khiri Khan Province. This is road construction.

Supervise the construction of a 0.28 m. thick reinforced concrete road with 6-8 traffic lanes and the construction of a large bridge across 3 intersections and 1 railway crossing, along with the construction of a drainage system, the installation of lighting systems, signs and traffic markings, along with safety equipment, for a total distance of 10.570 kilometers.

Controlling the construction of a 9-storey building with a usable area of approximately 7,400 square meters, including demolition work and procurement of field offices, architectural work, structural engineering work, building systems engineering work, procurement of educational equipment and facilities within the building.

Supervise construction work, including a warehouse building, 1 shared bathroom, 1 electrical room, drainage system around the building, roads and parking lot floors, and supervise interior decoration work of the office building.

Supervise the construction work of a 3-storey reinforced concrete office building, which includes architectural, civil and structural engineering, electrical, lighting, communication, air conditioning, sanitation, fire protection, and lightning protection systems, as well as providing various advice.

Controlling the construction of asphalt roads, 0.10 meters thick, 4 traffic lanes, traffic surface width 3.25 meters per lane, with a footpath width of 3.00 meters on each side.

Controlling the construction of asphalt roads with a thickness of 0.10 meters, 2 traffic lanes, traffic surface width of 3.50 meters per lane, shoulder width of 2.50 meters on each side.

Construction of a 0.10 meter thick asphalt concrete road, a 4-lane road, each lane 3.50 meters wide, dividing traffic directions with a concrete wall-type island 3.20 meters wide, with shoulders 3.00 meters wide. In the community area there is a sidewalk 3.40 meters wide

Controlling the construction work of the road construction project, Kamphaeng Phet City Planning, Kamphaeng Phet Province, starting at the intersection of Highway No. 1

Supervising the construction of a tunnel under an intersection on Road No. Chor.1023, with a tunnel under an intersection approximately 425.00 meters long, with 4 traffic lanes going and returning, each traffic lane 3.50 meters wide, a sidewalk for maintenance 1.20 meters wide on each side, and a ground-level road on the side, 2 traffic lanes on each side, 3.00 meters wide on each lane, 1.50 meters wide shoulders, complete with lighting, drainage, maintenance, and various tunnel equipment.